Ventura Port District - Ventura Harbor Public Boat Launch Ramp Floating Dock Replacement Project
The work consists of the removal and disposal of the existing boat ramp floats and the design, fabrication, and installation of replacement floats at the Ventura Harbor Public Boat Launch facility.
PLANS
(click to expand/collapse)

Name | Date | Size | ||
For Reference Only Launch Ramp Refurbishment | 11/20/2023 | 9.0 MB | ||
Topo Survey Exhibit (Launch Ramp) 2022-11-03-24X36 Topo Exhibit | 11/20/2023 | 454.2 KB | ||
Ventura Harbor Boat Ramp Float Plans 111423 | 11/20/2023 | 496.9 KB |