SBUSD #05-2021 - San Marcos High School Restrooms ADA Upgrades – Phase II

NOTICE TO CONTRACTORS CALLING FOR BIDS

Notice is hereby given that sealed bids will be received by the Board of Education of the Santa Barbara Unified School District at the Administration Offices, 724 Santa Barbara Street, Santa Barbara, California 93101 not later than:

1:00 p.m. on June 18, 2020 for the San Marcos High School Restrooms ADA Upgrades – Phase
II Project (“Project”).

A mandatory job walk and pre-bid conference will be conducted on, May 22, 2020, beginning at,
10:00 a.m.. Meet at the flagpole at San Marcos High School at 4750 Hollister Ave., Santa
Barbara, CA, 93110. Bids will not be accepted from contractors not attending the mandatory job
walk and pre-bid conference. Prospective Bidders arriving after the above-designated starting time for a mandatory job walk and pre-bid conference shall be disqualified from submitting a bid for this project.

Plans and specifications will be on file and available to view, download or purchase on, or as soon as possible, after the mandatory job walk and pre-bid conference at the Santa Barbara Unified School District Planning Department office at 724 Santa Barbara St., Santa Barbara, CA 93101. Plans and Specifications may also be viewed or purchased through Cybercopy at http://www.cybercopyplanroom.com

The deadline for pre-bid questions or clarification requests is, May 29, 2020. All questions are to be in writing and directed to the Project Architect/Engineer, Joe Wilcox, Kruger Bensen Ziemer Architects, Inc. at joew@kbzarch.com.

CLEARLY MARK BID RESPONSE ENVELOPE WITH TIME/DATE OF BID OPENING AND PROJECT NAME. Bids so received shall be opened and publicly read aloud at the Santa Barbara Unified School District Administration Office, 720 Santa Barbara Street, Santa Barbara, California
93101. All bids shall be made on the forms provided in the specifications and each bid must conform to the Contract Documents. Each bid shall be accompanied by the bid security specified in the Instructions to Bidders.

The Project description is as follows:
The Project includes a remodel (E) restroom, showers, and locker room to comply with ADA
requirements. Provide (N) finishes at walls and ceilings as indicated. (N) LED lighting,
relocate (E) fire alarm devices and wiring as required.

Additionally, provide mitigation of asbestos, lead and any other hazardous materials throughout area of work.

Contractor License required: B (General Building Contractor)

Prequalification of Bidders and E/M/P subcontractors: As a condition of bidding on this Project, and in accordance with the provisions of Public Contract Code section 20111.5 and 20111.6 all Bidders and all electrical, mechanical and plumbing subcontractors listed in the Bidder’s proposal must either be pre-qualified for at least five business days before the date of the opening of the bids or must submit a completed prequalification package by the deadline stated below. Bids not conforming to this requirement will not be accepted.

Prequalification packages are available through Cybercopy at http://www.cybercopyplanroom.com. Pre-qualification questions must be directed to L.M. Sweaney at lynns11s@aol.com or leave a voice message at (909) 377-8302.

Prequalification packages must be submitted to L.M. Sweaney & Associates, 180 Grass Valley Rd., Lot 3, Lake Arrowhead, CA 92352 (UPS or FED-EX ONLY) (Voice Message: 909-336-2771) no later than, May 25, 2020. [Note: Per PCC 2011.6 – must have submitted package at least 10 business days before bid opening, can specify earlier date]. FAXED PRE-QUALIFICATION APPLICATIONS WILL NOT BE ACCEPTED.

Pursuant to the provisions of Section 1773 and 1773.2 of the Labor Code of the State of California, the District has obtained from the Director of Industrial Relations, the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in the locality in which the work is to be performed for each craft, classification or type of workman needed to execute the contract which is available for review at http://www.dir.ca.gov/dlsr/statistics_research.html. During the Work, the Department of Industrial Relations (“DIR”) will monitor compliance with prevailing wage rate requirements and enforce the Contractor’s prevailing wage rate obligations, with a copy of the same being on file with the clerk of the District’s governing board. It shall be mandatory upon the contractor to whom the contract is awarded, and upon any subcontractor under him, to pay not less than the said specified rates to all workmen employed by them in the execution of the contract, and to comply with all prevailing wage requirements set forth in the Labor Code.

Pursuant to the provisions of Section 1771.1 of the Labor Code of the State of California, a contractor or subcontractor shall not be qualified to bid or engage in the performance of any contract for this project unless; (1) currently registered and qualified to perform public work pursuant to Section
1725.5; or (2) expressly authorized to submit a bid by Section 1771.1 and provided the contractor is registered to perform public work pursuant to section 1725.5 at the time the contract is awarded.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder will be required to post all job-site notices required by DIR regulations and other applicable law.

The successful bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the General Conditions.

The District will be participating in the Disabled Veteran Business Enterprises (DVBE) Participation
Goal Program pursuant to Education Code section 17076.11 and Public Contract Code section 10115.

No Bidder may withdraw his bid for a period of sixty (60) days after the date set for the bid opening. The District reserves the right to reject any and all bids or to waive irregularities in any bid.

BY THE ORDER OF THE BOARD OF EDUCATION OF THE SANTA BARBARA UNIFIED SCHOOL DISTRICT
By: Steve Vizzolini, Director of Facilities and Modernizations
Planning Department

Contract Amount: $450,000.00