Allan Hanckock College - Service Site Development Work for Placement of Draeger Burn Building Props

The scope of work consists of construction of new roadways, drainage, and utility improvements in support of the Draeger burn building props. This project includes clearing, grubbing, and grading for the construction of storm drain, water piping, electrical conduit, construction of concrete foundation, and construction of asphalt concrete pavement.
  ADDENDUM #1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Date Size
Addendum No. 1 1/19/2021 173.4 KB
ALLAN HANCOCK COLLEGE_PHASE V PLUS_B 1/19/2021 5.2 MB
Soils_Geological_Report_080910_reduced 1/19/2021 9.3 MB