City of Ventura - 2018-031 Wastewater Plant Aeration Blowers

Project consists of the construction and installation of new turbo blowers, blower and electrical building, existing building demolition, air piping, air distribution system, mixing system, centrate transfer pump and appurtenant work as shown on the plans with Drawing No. 2018-D-031. The Engineer's Estimate of cost is $8,000,000.