SBUSD - Washington Elementary School Roofing Replacement Project - REBID

The Work of this project consists of alterations to the existing school buildings B, C, D, E, that shall consist of, but are not limited to, the following: 1. Reroofing (full roofing replacement). 2.Replacement of skylights made necessary by the reroofing work. 3. Rough carpentry, patching & repairs associated with and made necessary by the reroofing work. 4. Incidental electrical work, associated with and made necessary by the reroofing work.

Status

Bidding Closed

Prebid Date5/17/21 11:00 am

Bid Date6/14/21 1:00 pm

Company & Contacts

Santa Barbara Unified School District

Lucia Gonzalez-Medina   805.963.4338 x6295

Location

290 Lighthouse Road, Santa Barbara, CA 93109

NOTICE TO CONTRACTORS CALLING FOR BIDS

Notice is hereby given that sealed bids will be received for a bid opening by the Board of Education of the Santa Barbara Unified School District at the Administration Office, 724 Santa Barbara Street, Santa Barbara, California 93101 not later than:

Bid opening will be held on June 14, 2021 at 1:00 pm for Washington Elementary School Roofing Replacement Project (“Project”).

A mandatory job walk and pre-bid conference will be conducted on May 17, 2021 beginning at 11:00 a.m. Meet at Washington Elementary School, 290 Lighthouse Road, Santa Barbara, CA 93109 at the flagpole Bids will not be accepted from contractors not attending the mandatory job walk and pre-bid conference. Prospective Bidders arriving after the above-designated starting time for a mandatory job walk & pre-bid conference shall be disqualified from submitting a bid for this project.

Plans and specifications will be on file and available to view, download or purchase on, or as soon as possible, after the mandatory job walk and pre-bid conference through Cybercopy at www.cybercopyplanroom.com

The deadline for pre-bid questions or clarification requests is June 7, 2021. All questions are to be
in writing and directed to the Project Architect / Engineer, Robert Robles, Robert Robles Architecture, Inc. at rr@robertroblesarch.com

CLEARLY MARK BID RESPONSE ENVELOPE WITH TIME AND DATE OF BID OPENING AND PROJECT NAME
Bids so received shall be opened and publicly read aloud at the Santa Barbara Unified School District Administration Office, 720 Santa Barbara Street, Santa Barbara, California 93101. All bids shall be made on the forms provided in the specifications and each bid must conform to the Contract Documents. Each bid shall be accompanied by the bid security specified in the Instructions to Bidders.

The Project description is as follows:

The Work of this project consists of alterations to the existing school buildings B, C, D, E, that shall
consist of, but are not limited to, the following:

1. Reroofing (full roofing replacement).
2. Replacement of skylights made necessary by the reroofing work.
3. Rough carpentry, patching &
repairs associated with and made necessary by the reroofing work.
4. Incidental electrical work,
associated with and made necessary by the reroofing work.

Contractor’ License required – B

Prequalification of Bidders and E/M/P subcontractors: As a condition of bidding on this Project, and in accordance with the provisions of Public Contract Code section 20111.5 and 20111.6 all Bidders and all electrical, mechanical and plumbing subcontractors listed in the Bidder’s proposal must either be pre-qualified for at least five business days before the date of the opening of the bids or must submit a completed prequalification package by the deadline stated below. Bids not conforming to this requirement will not be accepted.

Pursuant to Public Contract Code section 20111.6(j) a list of prequalified GC’s & electrical, mechanical, and plumbing subcontractors will be made available by the District no later than June 7, 2021 at lgonzalez@sbunified.org

Prequalification packages are available through the Cybercopy at http://www.cybercopyplanroom.com
Pre-qualification questions must be directed to L.M. Sweaney at lynns11s@aol.com or leave a voice message at (909) 337-8302.

Prequalification packages must be submitted to L.M. Sweaney & Associates, 180 Grass Valley Rd.,
Lot 3, Lake Arrowhead, CA 92352 (UPS or FED-EX ONLY) (Voice Message: 909-337-8302) no later
than May 28, 2021

Note: Per PCC 2011.6must have submitted package at least 10 business days before bid opening, can specify earlier date FAXED PRE-QUALIFICATION APPLICATIONS WILL NOT BE ACCEPTED.

Pursuant to the provisions of Section 1773 and 1773.2 of the Labor Code of the State of California,
the District has obtained from the Director of Industrial Relations, the general prevailing rate of perdiem wages and the general prevailing rate for holiday and overtime work in the locality which work is to be performed for each craft, class or type of workman needed to execute the contract which is available for review at http://www.dir.ca.gov/dlsr/statistics_research.html During the Work,the Department of Industrial Relations (“DIR”) will monitor compliance with prevailing wage rate requirements and enforce the Contractor’s prevailing wage rate obligations, with a copy of the same being on file with the clerk of the District’s governing board. It shall be mandatory upon the contractor to whom the contract is awarded, and upon any subcontractor under him, to pay not less than the said specified rates to all workmen employed by them in the execution of the contract, and to comply with all prevailing wage requirements set forth in the Labor Code.

Pursuant to the provisions of Section 1771.1 of the Labor Code of the State of California, a contractor
or subcontractor shall not be qualified to bid or engage in the performance of any contract for this project unless; (1) currently registered & qualified to perform public work pursuant to Sec 1725.5; or (2) expressly authorized to submit a bid by Section 1771.1 and provided the contractor is registered to perform public work pursuant to sec. 1725.5 at the time the contract is awarded.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder will be required to post all job-site notices required by DIR regulations and other applicable law.

The successful bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the General Conditions.

The District will be participating in the Disabled Veteran Business Enterprises (DVBE) Participation
Goal Program pursuant to Education Code section 17076.11 and Public Contract Code section 10115.

No Bidder may withdraw his bid for a period of sixty (60) days after the date set for the bid opening.
The District reserves the right to reject any and all bids or to waive irregularities in any bid.

BY THE ORDER OF THE BOARD OF EDUCATION OF THE SANTA BARBARA UNIFIED SCHOOL
DISTRICT

By: Steve Vizzolini, Director of Facilities and Modernization
Planning Department