City of Ventura - 2019-065 Ventura River Trail - Sheridan Way Bike Path Link

Project consists of construction of a new concrete bike path and appurtenant work as shown on the plans with Drawing No. 2019-D-065. The Engineer's Estimate of cost is $298,985.
ADDENDUM #1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Date Size
Sheridan Way Addendum 1 1/25/2022 325.8 KB
Sheridan Way Bike Path - Addendum 1 PLANS 1/25/2022 1.1 MB