City of Ventura - 2019-065 Ventura River Trail - Sheridan Way Bike Path Link

Project consists of construction of a new concrete bike path and appurtenant work as shown on the plans with Drawing No. 2019-D-065. The Engineer's Estimate of cost is $298,985.
Date Company Contact
1642604046
1/19/22 2:54 pm
All Land Construction Inc Golden Pond Dr
Camarillo, CA 93012
Hector Navarrete
Tel: 805 910-5699
Fax: Na
1642060913
1/13/22 8:01 am
BSN Construction Inc 4171 Market St Ste C-5
Ventura, CA 93003
Ben Nakaba
President
Tel: 805-676-1864
Fax: 805-676-1210
1642001143
1/12/22 7:25 am
City of Ventura Ventura, CA 93003 Pam Baumgardner
Tel: 805-654-7870
1643024508
1/24/22 11:41 am
Construct Connect 30 Technology Pkwy S
Suite 100
Norcross, GA 30092
Construct Connect
Tel: 323-602-5079
1642001155
1/12/22 7:25 am
CyberCopy 3040 Sherwin Ave
Suite I
Ventura, CA 93003
Ian FitzGerald
Operations Manager
Tel: 805-642-3292
1642123714
1/14/22 1:28 am
Dodge Data & Analytics 2860 S State Hwy 161
Ste 160 #501
Grand Prairie, TX 75052
Dodge Data Analytics
Dodge Data & Analytics
Tel: 413-376-7032
1642775108
1/21/22 2:25 pm
Maximum Break Inc 27704 Skyline Court
Castaic, CA 91384
Benjamin Markowitz
Tel: 8058161661
1642414979
1/17/22 10:22 am
TORO ENTERPRISES, INC 2101 E VENTURA BLVD
OXNARD, CA 93036
Ben Ramirez
Bid Coordinator
Tel: 8054834515
Fax: 8054832001
1642065822
1/13/22 9:23 am
Ventura County Contractors Association 1830 Lockwood Street
Suite 110
Oxnard, CA 93036
Ali Duran
Plan Room Coordinator
Tel: 805-981-8088
Fax: 805-981-8089