Ventura Harbor Village - New Trash Enclosures Project

Work consists of: (1) The construction of a new trash enclosure at buildings 1559 and 1691, and demolition of the existing trash enclosures at 1559, 1575, and 1583. (2) Modification to the approach to the trash enclosures from the sidewalk, to enhance the handicap accessibility.
PLANS (click to expand/collapse)
Name Date Size
VHV TRASH ENCLOSURES 1559 AND 1691 BID SET 9.12.22 9/13/2022 10.4 MB