Allan Hancock College - Bid No. 23-04 Demolition of Buildings E & F Project
The Work of this Section is Design-Build. The Contractor shall design a plan for the demolition and removal and proper disposal of all demolished materials, including all Hazardous Materials, and submit this plan to the AHC Site Representative for review and approval prior to start of demolition activities.
SPECS
(click to expand/collapse)

Name | Date | Size | ||
AHC-01 800 S. College Dr. Bldgs. E F Pre-Demo Asb Lead Survey-amended 5-6-22 (002) | 2/14/2023 | 4.4 MB | ||
AHC-01 800 S. College Dr. Bldgs. E F Roofing Transmittal (002) | 2/14/2023 | 1.0 MB | ||
Asbestos and Lead Abatement Specifications- AHC Bldgs. E F (002) | 2/14/2023 | 559.0 KB | ||
Building Demolition Section 02200 | 2/14/2023 | 129.5 KB | ||
Front End Bid Docs 23-04 | 2/14/2023 | 1.2 MB |