City of Oxnard - PW 21-34 Etting Road Sidewalk & Bicycle Lane Improvement Project

Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to construct new concrete sidewalk, curb and gutter, minor road widening, driveway reconstruction, electrical conduit and pullboxes for street lighting, bike lanes, landscaping and irrigation system along Etting Road from E. Pleasant Valley Road to the eastern City Limit. The Work includes the milling of existing asphalt concrete pavement; placement and compaction of asphalt concrete pavement; excavation and reconstruction of a portion of street; concrete works; adjust utility covers to finished grade; installation of storm drain lines and appurtenant concrete structures; and traffic striping.
ADDENDUM #1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Date Size
Addendum #1 - Signed Plans 5/8/2023 109.7 KB
PW 21-34 - Signed Plans 05-04 5/8/2023 9.7 MB