City of Ventura - 2021-039 Street Resurfacing - Bristol Rd. Johnson Dr. to Ermine Ave.

Project consists of resurfacing Bristol Road from Johnson Drive to Ermine Avenue. and appurtenant work as shown on the plans with Drawing No. 2021-D-039. The Engineer's Estimate of cost is $1,660,000.00.
SPECIFICATIONS (click to expand/collapse)
Name Date Size
Bristol Resurfacing - SPECIFICATIONS 5/4/2023 3.8 MB