City of Ventura - 2020-22 Traffic Signal Communications System Upgrade

Project consists of installing new traffic signal controllers, switches, conduit, new fiber-optic interconnect and appurtenant work as shown on the plans with Drawing No. 2020-D-022. The Engineer's Estimate of cost is $7,500,000.
ADDENDUM #1 (click to expand/collapse)
ADDENDUM #2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Date Size
City of Ventura - Traffic Signal System - 2020-022 - Addendum #2 6/19/2023 635.8 KB
ADDENDUM #3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Date Size
City of Ventura - Traffic Signal System - 2020-022 - Addendum #3 6/27/2023 605.7 KB
ADDENDUM #4 (click to expand/collapse)
ADDENDUM #5 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Date Size
City of Ventura - Traffic Signal System - 2020-022 - Addendum #5 6/29/2023 1.1 MB