City of Ventura - 2022-037 Harmon Barranca Bike Path Connection
Project consists of installing two (2) HAWK signals, 1 Rectangular Rapid Flashing Beacon (RRFB) beacon crossings along the Harmon Barranca Path corridor that runs from State Route 126 to US 101 Freeway east of Victoria Avenue. The project will install a two (2) High Intensity Activated crosswalk (HAWK) style crossing at the Harmon Barranca Path crossing at both Telephone Road and Bristol Road, a rectangular rapid flashing beacon at the Harmon Barranca crossing at Ralston Street, and appurtenant work as shown on the plans with Drawing No. 2022-D-037. The Engineer's Estimate of cost is $690,000.
Plan Holders
Date | Company | Contact |
5/12/23 1:02 pm | City of Ventura Ventura, CA 93003 |
Pam Baumgardner
Tel: 805-654-7870
|
5/12/23 1:02 pm |
CyberCopy
3040 Sherwin Avenue Suite J Ventura, CA 93003 |
Ian FitzGerald
Operations Manager
Tel: 805-642-3292
|
6/1/23 8:59 am |
McCain Inc
2365 Oak Ridge Way Vista, CA 92081 |
Dave Weir
Project Administrator
Tel: 760-734-5019
Fax: 760-734-5064
|
5/15/23 12:23 pm |
TORO ENTERPRISES, INC
2101 E VENTURA BLVD OXNARD, CA 93036 |
TYSON RISING
Bid Coordinator
Tel: 8054834515
Fax: 8054832001
|
5/19/23 8:27 am |
Taft Electric
1694 Eastman Avenue Ventura, CA 93003 |
Estimating Assistant
Estimating Dept.
Tel: 805-642-0121
|
5/12/23 5:14 pm |
Ventura County Contractors Association
1830 Lockwood Street Suite 110 Oxnard, CA 93036 |
Plan Room
Plan Room Coordinator
Tel: 805-981-8088
Fax: 805-981-8089
|