PW 23-13R2 OWTP Fuel Management System Replacement Project (Rebid)
Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to replace the existing fuel management system at the Oxnard Wastewater Treatment Plant and updated pumps and piping.
Plan Holders
Date | Company | Contact |
4/29/24 10:25 am |
City of Oxnard
305 W. Third Street, East Wing, 2nd Floor Oxnard, CA 93030 |
Renee Hatcher
Project Coordinator Public Works
Tel: 805.200.5289
|
4/26/24 10:05 am |
Construct Connect
30 Technology Pkwy S Suite 100 Norcross, GA 30092 |
Construct Connect
Tel: 323-602-5079
|
4/29/24 10:25 am |
CyberCopy
3040 Sherwin Avenue Suite J Ventura, CA 93003 |
Ian FitzGerald
Operations Manager
Tel: 805-642-3292
|
4/29/24 10:25 am |
CyberCopy
3040 Sherwin Avenue Suite J Ventura, CA 93003 |
Jordan Plymale
Plan Room Administrator
Tel: 805-642-3292
|
4/17/24 11:16 am |
EFS West
28472 Constellation rd Valencia, CA 91355 |
Von Regli
PM
Tel: 18182356283
|
4/30/24 9:47 am |
Fuel Serv
4190 Mission Blvd Montclair, CA 91763-6012 |
Robert Rodriguez
President
Tel: 8005813710
|
4/22/24 7:39 am |
PlanHub, Inc.
1665 Palm Beach Lakes Blvd Ste.950 West Palm Beach, FL 33401 |
Project Coordinator
Tel: 202 843 5060 ext957
|
4/17/24 3:39 pm |
Ventura County Contractors Association
1830 Lockwood Street Suite 110 Oxnard, CA 93036 |
Plan Room
Plan Room Coordinator
Tel: 805-981-8088
Fax: 805-981-8089
|
5/3/24 3:15 pm |
West Star Environmental, Inc.
4770 W. Jennifer Ave. Fresno, CA 93722 |
Michelle Avalos
Administrator Assistant
Tel: (559) 277-9378
Fax: (559) 277-0106
|