PW 23-13R2 OWTP Fuel Management System Replacement Project (Rebid)
Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to replace the existing fuel management system at the Oxnard Wastewater Treatment Plant and updated pumps and piping.
SPECIFICATIONS
(click to expand/collapse)
Name | Size | ||
APCD Permit to Operation ATC PTO 06415 111 | 212.1 KB | ||
PW 23-13R2 OWTP Fuel Management System Bid Package (Rebid) | 1.9 MB | ||
PW23-13R2_Reference Electrical Sheets | 16.6 MB |