H.E.S.D. - Project #23-24-02 - Ansgar Larsen ES New Modular Classroom Building

The project includes, but is not limited to, full site preparation and foundation work to accommodate two pre-manufactured 72’-6” x 40’-0” TK modular classroom buildings, each equipped with accessible toilet rooms. The scope involves excavation, grading, building foundations, installation of underground utilities and connections to the new buildings, as well as fire alarm, communication, public address (PA), and data systems. Additional work includes signage, site flatwork, irrigation and landscaping, paving, striping, and the installation of a playground.

Status

Accepting Bids

Prebid Date 6/18/25 10:00pm
Bid Date 7/10/25 2:00pm

Company & Contacts

Hueneme Elementary School District
Rafael  
Alamillo

Location

550 Thomas Ave., Oxnard, CA 93033

Project Contacts:

Balfour Beatty

Rafael Alamillo

Senior Project Manager | Balfour Beatty

C: 805.2087462

E: ralamillo@balfourbeattyus.com | www.balfourbeattyus.com

300 E Esplanade Drive, Suite #1220, Oxnard, CA 93036

 

Dennis Kuykendall

Director - Ventura | Balfour Beatty

C: (805) 574-9131

E: dkuykendall@balfourbeattyus.comwww.balfourbeattyus.com

300 E Esplanade Drive, Suite #1220, Oxnard, CA 93036

 

Filbert Carbajal

Project Engineer | Balfour Beatty

C: 805-266-1052

E: fcarbajal@balfourbeattyus.com | www.balfourbeattyus.com

300 E. Esplanade Drive, Suite 1220, Oxnard, CA 93036

 

Hueneme Elementary School District

David Ragsdale

Associate Superintendent, Technology and Strategic Operations

Hueneme Elementary School District

805-488-3588 ext. 9801

dragsdale@hueneme.org

Flewelling & Moody

Jun Tanaka, AIA

Flewelling & Moody

99 S. Lake Ave., Suite 300

Pasadena, CA  91101

t. 323-543-8300

t. 323-543-8322 (Direct)

jtanaka@flewelling-moody.com