HQ HVAC Replacement Project
Work includes demolition and disposal of three existing rooftop HVAC units and installation of Owner-furnished Contractor-installed Trane HVAC units including all new rooftop ductwork, isolation system, roof repair, bracing and framing. Work also includes removal and replacement of all interior VAV units including associated ceiling removal and replacement, flex duct replacement at supply and returns, piping and valves as shown in the bid plans and specifications.
Plan Holders
| Date | Company | Contact |
| 12/29/25 1:20 pm |
Ardalan Construction Company, Inc., bids@ardalancc.com
8 E. Gainsborough Rd.
Thousand Oaks, CA 91360 |
Teo Barragan
Tel: 805-496-7273
Fax: 805-496-7310
|
| 12/30/25 2:41 pm |
Dodge Data and Analytics
3315 Central Ave
Hot Springs, AR 71913 |
April Hamilton
Document Coordinator
Tel: 206-328-5615
Fax: 253-537-3597
|
| 12/30/25 7:41 am |
PlanHub, Inc.
1665 Palm Beach Lakes Blvd Ste.950
West Palm Beach, FL 33401 |
Project Coordinator
Tel: 202 843 5060 ext957
|
| 12/29/25 10:27 am |
Ventura County Contractors Association
1830 Lockwood Street
Suite 110 Oxnard, CA 93036 |
Plan Room
Plan Room Coordinator
Tel: 805-981-8088
Fax: 805-981-8089
|








